Tel:+86-0592-5256019
News
News

2020-09-10
+ More
+ More
+ More
The company 2 sets of fluidize Bed (Circulating Fluidized Bed, CFB) boiler, is the use of Clean energy released in 2003 by the U.S. department of energy process (the Clean Coal Technology designed), the process for Coal and petroleum coke as fuel.
+ More
Formosa tinh mills investments in early 2008 to date more than nine years after the official seal, after twists and turns during factory and trial, but the static steel by virtue of the spirit of perseverance, with 1 blast furnace in on May 29, 2017 runs smoothly after ignition test, the production of steel products is also gradually establish a good reputation in the industry, at the end of April, 2018 to finish 2 bf all the preparation work before test Che, gaining momentum.
+ More
 

All rights reserved © Xiamen Done Power Engineering Group Address: Room 507, Caifugangwan, No.398, Jiahe Road, Huli District, Xiamen City Tel: +86-0592-5256019