Tel:+86-0592-5256019
With Formosa
with Formosa Plastics Group

Since the group was founded in 2001 , we have maintained a long-term friendly cooperative relationship with Formosa Plastics Group and have continued to this day. In China, we have established long-term cooperative relationship with Zhangzhou Huayang Houshi Power Plant, Ningbo Industrial Park, Kunshan Industrial Park and Fujian Fuxin Special Steel Co., Ltd. of Formosa Plastics Group. We have participated in more than 100 construction projects in various plants, which have won the acceptance of the owners and have a good reputation in the plants. Combined with the management and construction capacity and experience of the headquarters of Chinese Company, in 2014, we followed the pace of Formosa Plastics Group to invest in Vietnam, formally established Yueneng Electrical and Mechanical Co., Ltd., opened a comprehensive presence in the Vietnamese market, and undertook the engineering and procurement business in Ha Tinh Steel Xingye Co., Ltd. and Xingye Co., Ltd. of Formosa Plastics Group. Due to the expansion of our business and the need for long-term development, and according to the additional investment by Formosa Plastics Group in Louisiana in 2017,we decide to enter the U.S. market and start a cooperation with Formosa Plastics Group in the United States in order to further strengthen the partnership with Formosa Plastics Group.

(part of ) the achivements related to Formosa Plastics Group
item numbername of the projectproject time limit contract amounnt (dollars) construction site
1stack mounting of the 6X600 MW stacker-reclaimer of Zhangzhou Houshi Power Plant1999-2002 642,857 Huayang Houshi Power Plant
2Installation of the coal conveying system of Ningbo Beilun Industrial Park of Formosa Plastics Group2003 500,000 Ningbo Industrial Park of Formosa Plastics Group
3manufacturing and installation of the steel structure of the third phase of Zhangzhou Houshi Power Plant2003 203,857 Huayang Houshi Power Plant
4Installation of HD, PD1--PD4 stacker-reclaimer of Huayang Houshi Power Plant2004 600,000 Huayang Houshi Power Plant
5Piping of the low pressure pipeline of Unit #72007 1,157,143 Huayang Houshi Power Plant
6Installation of the stacker-reclaimer of the central column of the coal bunker of Huayang Houshi Power Plant in Zhangzhou2007 154,286 Huayang Houshi Power Plant
7manufacturing and installation of dust removing and ventilation of the third phase coal conveying system of Huayang Houshi Power Plant in Zhangzhou2007 91,429 Huayang Houshi Power Plant
8examination and repairing of the CP1-CP7 rotary separators of Huayang Power Plant2012 147,143 Huayang Houshi Power Plant
9Improvement of the CP1-CP4 ECO&SCR fly ash system2013 810,286 Huayang Houshi Power Plant
10reservation plan of lining examination and repairing of the acid-base tank of the gas duct of the desulfurizing tower2013 527,143 Huayang Houshi Power Plant
11manufacturing and installation of the HD2 central column and stacker-reclaimer2013 168,571 Huayang Houshi Power Plant
12reservation project of ceramic mending of the pulverized coal pipe of the CP1-CP7 boilers2013 152,857 Huayang Houshi Power Plant
13reservation project of anti-corrosion of the FGD closed drainage conduit of boilers #1-#72013 120,857 Huayang Houshi Power Plant
14ceramic mending of the coal conveying & charging conduit2013 82,857 Huayang Houshi Power Plant
15project of examination and repairing of the decelerator of the coal mill2014 571,429 Huayang Power Plant, Ningbo Thermal Power Plant, Kunshan Thermal Power Plant, Nantong Thermal Power Plant
16reservation project of the examination and repairing of the diesel engine 2014 96,286 Huayang Houshi Power Plant
17reservation plan of the examination and repairing of the ship unloader2015 457,143 Huayang Houshi Power Plant
18程project of manufacturing and installation of the coal conveying system of the third-phase 4X600 MW plant unit of Zhangzhou Power Plant2005-2006 2,165,714 Zhangzhou Houshi Power Plant
19reservation project of piping repairing2015-2017 535,000 Ha Tinh Steel Corporation in Vietnam
20reservation project of repairing of the whole-plant conveyor2015-2018 4,025,000 Ha Tinh Steel Corporation in Vietnam
21reservation plan of the equipment examination and repairing of the coal conveying system2015-2018 1,131,429 Huayang Houshi Power Plant
22reservation project of the stacker-reclaimer and public axiliary equipment of the raw material plant2016-2018 360,000 Ha Tinh Steel Corporation in Vietnam
23examination and repairing of the steam mechanical equipment of Ha Tinh2016-2019 2,085,850 Ha Tinh Steel Corporation in Vietnam
24examination and repairing of the public mechanical equipment of Ha Tinh2016-2019 1,445,000 Ha Tinh Steel Corporation in Vietnam
25reservation project of the mechanical steel structures of Ha Tinh Factory2017-2019 1,605,710 Ha Tinh Steel Corporation in Vietnam
26reservation project of repairing of the whole-plant conveyor2018-2020 4,771,409 Ha Tinh Steel Corporation in Vietnam
27reservation project of examination and repairing of the steel static electricity dust collector of Ha Tinh
2018-2020 239,100 Ha Tinh Steel Corporation in Vietnam

All rights reserved © Xiamen Done Power Engineering Group Address: Room 507, Caifugangwan, No.398, Jiahe Road, Huli District, Xiamen City Tel: +86-0592-5256019