Tel:+86-0592-5256019
Our cases
Turbine MaintenanceTurbine Maintenance

企业微信截图_15614450466001.png

Successful cases:

  • Overhaul of NB1-NB3 Turbine Generator in Ningbo Thermal Power Plant

  • Maintenance of KS1-KS3 Turbine Generator in Kunshan Electronic Thermal Power Plant

  • Maintenance of KP1-KP2 Turbine Generator in Kunshan Fiber Thermal Power Plant

  • Maintenance of NT-1 Turbine Abnormality in Nantong Thermal Power Plant

  • Overhaul of 01# 02# Turbine in Nine Dragons Paper Industry (Tianjin) Co., Ltd.

  • Maintenance and Periodical Inspection of HG1/2 and HC1-3 Turbine Generators in Steam Power Plant of Ha Tinh Steel Works, Vietnam

  • Periodical Inspection of VN1-3 Steam Turbine Generator in Renze Public Utility Plant, Vietnam

All rights reserved © Xiamen Done Power Engineering Group Address: Room 507, Caifugangwan, No.398, Jiahe Road, Huli District, Xiamen City Tel: +86-0592-5256019